R-26-0081
1. New District Classiflcation. Revise Section 35-170 to create a new primary zoning
district classiflcation of “Southern Virginia Mega Site District, M-SVMS”, identifled as
Division 14, upon the following terms.
2. Intent of M-SVMS; Eligibility for Rezoning.
a. The intent and purpose of the Southern Virginia Mega Site District (hereinafter
referred to as "M-SVMS") is to be a district that is unique to those parcels which comprise
the Southern Virginia Mega Site at Berry Hill, the contiguous property positioned for large-
scale industrial development by the Danville Pittsylvania Regional Industrial Facilities
Authority designated on the property boundary entitled “Southern Virginia Megasite at
Berry Hill M-SVMS – Exhibit A”, dated December 2025, attached hereto and incorporated
herein as Exhibit A.
b. No property will be eligible for rezoning to M-SVMS unless it is contiguous with other
land that is zoned M-SVMS. Section 35-142 shall not apply to the M-SVMS District.
c. Any division of land within M-SVMS for purposes of creating conservation area shall
not be subject to the requirements of the Pittsylvania County Code Chapter 18 Subdivision
Ordinance.
3. Permitted Uses within M-SVMS as Matter of Right. All uses permitted in M-2 and all
uses identifled on Schedule 1 attached hereto shall be permitted by-right in M-SVMS.
4. New M-SVMS Industrial District Regulations.
a. Performance Standards.
i. All standards applicable to M-2 shall apply to uses in M-SVMS, except that (i) Data
Center uses in M-SVMS shall only be governed by the standards for Data Centers set forth
herein, and (ii) Power Station uses in M-SVMS shall only be governed by the standards for
Power Stations set forth herein.
ii. The rezoning of any property outside of the M-SVMS District subsequent to the
adoption of the M-SVMS District shall not affect the previously applicable M-SVMS
provisions for setbacks, screening, buffers, noise, and any other requirements under the M-
SVMS District and the provisions of the M-SVMS District related to adjacent non-M-SVMS
zoned properties shall not be applicable.
b. Site Development Plans.
i. In M-SVMS, the Zoning Administrator shall have sole authority to administratively
review and issue flnal approval of Site Development Plans. Site Development Plans shall
not be subject to review by any other authority.
2
ii. The Zoning Administrator’s review of Site Development Plans shall be limited to
verifying (i) the Site Development Plan complies with applicable Federal codes and
regulations and the statutory provisions applicable to site plans required by the Code of
Virginia (1950), as amended, (ii) the Site Development Plan application complies with
Section 35-753 of the Ordinance, and (iii) the Site Development Plan otherwise conforms
with the applicable requirements of M-SVMS.
c. Data Center Standards. The following standards shall apply to any Data Center use
within the M-SVMS District.
i. Water. To the extent the applicable municipal water system can supply the demand,
Data Centers utilizing water-based cooling systems shall be connected to a municipal
water system.
ii. Height. The maximum height for a Data Center shall be 150 feet, as measured from
grade; provided, however, rooftop elements such as mechanical equipment, elevator and
stair overruns, parapets, guardrails and safety railings, screening enclosures,
telecommunications equipment, and other rooftop appurtenances shall all be excluded
from the calculation of Data Center height.
iii. Screening.
1. Power generators, water cooling systems, storage facilities, and any other
mechanical infrastructure necessary for the operation of the Data Center other than water
storage tanks and Power Stations must be screened from major arterials/interstates and
from abutting residentially zoned properties.
2. Any solid screening walls visible from an adjacent public street must be constructed
with a design, materials, details, and treatment compatible with those used on the nearest
principal façade of a building but may include perforated surfaces as needed for ventilation
of mechanical equipment.
iv. Design. Principal façade of a Data Center that is visible from major arterials or
interstates must incorporate façade articulation and avoid long, undifferentiated surfaces
by including at least two of the flve following design elements: change in building height,
building step‑backs/recesses, fenestration, changes in materials, texture, color, or use of
accent materials.
v. Setbacks.
1. Guard houses and accessory structures shall not be located closer than 250 feet to
the property line of any adjacent residentially zoned properties.
3
2. Ground mounted mechanical equipment must be setback a minimum of 100 feet
from the property line of any adjacent residentially zoned properties.
vi. Buffers.
1. A one hundred foot (100’) wide buffer yard is required in order to screen Data
Centers from adjacent major arterials/interstates and non-M-SVMS zoned properties.
Such buffer yards (i) may be collocated within the setbacks required under this section, (ii)
shall be installed on an earthen berm that has a minimum height of six feet (6’) above the
level of the grade existing at the property boundary line at the time of Site Development
Plan review and a slope not steeper than 2:1, and (iii) shall include a minimum 100-foot-
wide landscaped area comprised of any existing vegetation supplemented as needed with
a staggered row of planted trees and large shrubs. All rows of planted vegetation shall be
evergreen plantings of varieties native or adaptable to the region, with one (1) row
consisting of a variety expected to reach a minimum height of twenty-flve feet (25’) and the
remaining rows of varieties designed to reach at least flfteen feet (15’) in height at maturity.
All evergreens shall be a minimum of six feet (6’) in height at time of planting.
2. Within required buffers, existing forest resources shall be preserved whenever
possible. Notwithstanding the requirements of this section, the use of natural topography
and preservation of existing vegetation, supplemented by new vegetation, if needed, may
be substituted for the above requirements when found by the Zoning Administrator to
provide visual screening from adjacent land uses at a density, depth, and height reasonably
equivalent to the buffer yard with an earthen berm.
3. Security fencing and utilities may be located within and parallel to required buffers.
4. Access roads may cross required buffers at approximately right angles, provided the
crossing may vary up to flfteen (15) degrees from the line drawn perpendicular to the
centerline of the required buffers at the intended crossing location.
vii. Safety Response Plan.
1. The owner or operator of the Data Center shall coordinate with the County Fire and
EMS personnel to provide materials, education and/or training on how to safely respond to
on-site emergencies.
2. Prior to issuance of a building permit for a Data Center, the owner or operator of the
Data Center shall provide the Zoning Administrator with a safety response plan that is
acceptable to the Director of Public Safety or its designee, and provides protocols for how
to safely respond to emergencies at on-site facilities. The owner or operator of the Data
Center shall promptly provide the Director of Public Safety any updates to the safety
4
response plan to the extent updates are required as a result of changes to onsite
operations, and shall respond to requests from the Director of Public Safety conflrming
whether there have been any updates to the safety response plan no less than annually.
3. All access roads shall be wide enough to accommodate safe ingress and egress of
emergency vehicles. Access over emergency routes on the property for County Fire and
EMS personnel providing emergency services shall be agreed upon in the approved safety
response plan.
viii. Generators. Maintenance and emissions compliance testing shall be limited to
weekdays between 9:00 a.m. and 5:00 p.m., provided that generators may be tested
outside of this window to the extent necessary to comply with limits, restrictions, or
prohibitions on emissions testing imposed by local, state and/or federal authorities during
those hours, and/or as required under applicable Virginia Department of Environmental
Quality regulations and permits.
ix. Noise. Data Centers located adjacent to residentially zoned properties shall not be
operated or participate in the operation of any stationary noise source or any source of
sound or noise which generates a sound pressure level when measured at the property line
that exceeds the limits set forth in the Pittsylvania County Noise Ordinance, Section 41-6,
Industrial Land Use Category.
x. Security Fencing.
1. If the facilities are enclosed in security fencing, all such security fencing shall be a
minimum of 6 ft. in height and designed with features to deter climbing.
2. The location of security fencing shall be shown on the Site Development Plan.
d. Power Station Standards. The following standards shall apply to any Power Station
use within the M-SVMS District.
i. Height. The maximum height for a Power Station, including combustion turbine
stacks, shall be 220 feet, as measured from grade. The maximum height may be increased
by one foot for each additional foot of minimum setback from the property line.
ii. Base Setbacks. All structures comprising a Power Station use shall be set back a
minimum of 500 feet from the property line of any adjacent residentially zoned properties.
iii. Buffers.
1. A one hundred foot (100’) wide buffer yard is required in order to screen Power
Stations from adjacent major arterials/interstates and non-M-SVMS zoned properties.
Such buffer yards (i) may be collocated within the setbacks required under this section, (ii)
5
shall be installed on an earthen berm that has a minimum height of six feet (6’) above the
level of the grade existing at the property boundary line at the time of Site Development
Plan review and a slope not steeper than 2:1, and (iii) shall include a minimum 100-foot-
wide landscaped area comprised of any existing vegetation supplemented as needed with
a staggered row of planted trees and large shrubs. All rows of planted vegetation shall be
evergreen plantings of varieties native or adaptable to the region, with one (1) row
consisting of a variety expected to reach a minimum height of twenty-flve feet (25’) and the
remaining rows of varieties designed to reach at least flfteen feet (15’) in height at maturity.
All evergreens shall be a minimum of six feet (6’) in height at time of planting.
2. Within required buffers, existing forest resources shall be preserved whenever
possible. Notwithstanding the requirements of this section, the use of natural topography
and preservation of existing vegetation, supplemented by new vegetation, if needed, may
be substituted for the above requirements when found by the Zoning Administrator to
provide visual screening from adjacent land uses at a density, depth, and height reasonably
equivalent to the buffer yard with an earthen berm.
3. Security fencing and utilities may be located within and parallel to required buffers.
4. Access roads may cross required buffers at approximately right angles, provided the
crossing may vary up to flfteen (15) degrees from the line drawn perpendicular to the
centerline of the required buffers at the intended crossing location.
iv. Safety Response Plan.
1. The owner or operator of the Power Station shall coordinate with the County Fire and
EMS personnel to provide materials, education and/or training on how to safely respond to
on-site emergencies.
2. Prior to issuance of a building permit for a Power Station, the owner or operator of
the Power Station shall provide the Zoning Administrator with a safety response plan that is
acceptable to the Director of Public Safety or its designee, and provides protocols for how
to safely respond to emergencies at on-site facilities. The owner or operator of the Power
Station shall promptly provide the Director of Public Safety any updates to the safety
response plan to the extent updates are required as a result of changes to onsite
operations, and shall respond to requests from the Director of Public Safety conflrming
whether there have been any updates to the safety response plan no less than annually.
3. All access roads shall be wide enough to accommodate safe ingress and egress of
emergency vehicles. Access over emergency routes on the property for County Fire and
EMS personnel providing emergency services shall be agreed upon in the approved safety
response plan.
6
v. Maintenance. The owner or operator shall maintain the Power Station in good
condition. Such maintenance shall include, but not be limited to, painting, structural
integrity of the equipment and structures and, as applicable, maintenance of any required
buffer areas.
vi. Noise. During operation, a Power Station located adjacent to residentially zoned
properties shall not produce a noise level when measured at the property line that exceeds
the limits set forth in the Pittsylvania County Noise Ordinance, Section 41-6, Industrial
Land Use Category.
vii. Security Fencing.
1. The facilities shall be enclosed by security fencing.
2. All security fencing shall be a minimum of 6 ft. in height and designed with features
to deter climbing.
3. The location of security fencing shall be shown on the Site Development Plan.
7
Exhibit A
Property boundary of M-SVMS Property
8
Schedule 1
• Accessory Structure. Subordinate building/structure on the same lot as and
incidental to the principal building or land use (for example, without limitation, storage
facilities, security buildings, administrative buildings, gazebos, carports, private
greenhouses, sheds, etc.). Fences shall not be an accessory structure.
• Brewery or Distillery. A Commonwealth-licensed industrial facility where beer or
spirits are manufactured for sale; capacity exceeds 15,000 barrels/year (brewery) or 5,000
gallons/year (distillery). On premises consumption is permitted as an accessory.
• Car Wash. Facility for washing and/or waxing motor vehicles using automated or
semi automated methods or similar equipment, operated by patrons or others; treated as a
separate use, not merely accessory to gas stations or auto service.
• Conservation Area. An area in which the renewable resources of soil, water, wildlife,
and/or forest are protected, managed and preserved, including, without limitation, for
purposes of generating offset credits as may be required by the applicable governmental
authorities of the Commonwealth of Virginia to develop any other property located within
M-SVMS, all in accordance with applicable laws and regulations.
• Construction Building or Yard, Temporary. Temporary building/structure or laydown
area used to manage a construction site or store equipment, materials, and
appurtenances.
• Construction Yard. An establishment primarily engaged in construction activities,
including outside storage of construction materials and equipment; typical of building
contractors’ yards.
• Data Center. A facility used primarily for the storage, management, processing, and
transmission of digital data, which houses computer and/or network equipment, systems,
servers, appliances, and other associated components related to digital data operations.
Such facility may also include air handlers, power generators, water cooling and storage
facilities, utility substations, security booths, and other associated utility infrastructure,
security infrastructure, accessory structures, storage areas and ancillary uses that support
development of and operations at a Data Center.
• Laboratory, Research, and Development. An establishment for research,
compounding or packaging of scientiflc products, and research/development in technology
intensive flelds; may include prototype development and associated light manufacturing.
9
• Laundry Service, Commercial/Dry Clean. Establishments primarily providing
laundering, cleaning, or dyeing services other than personal services; typical uses include
bulk laundry/cleaning plants, diaper services, and linen supply.
• Manufacturing, Heavy. Processing or converting raw or unflnished materials into
different articles or substances, often with signiflcant external effects (e.g., noise, smoke,
vibration, odor) or risks involving hazardous materials.
• Manufacturing, Light. On site production, assembly, packaging, or fabrication of
goods within enclosed structures without signiflcant external effects; retail sales may be
incidental.
• Manufacturing, Small-Scale. Small scale maker or production uses using shared or
individual tools/machinery to make products; may include design, processing, assembly,
testing, repair, packaging, and incidental retail/wholesale and training.
• Mini Warehouse. Self storage facility of enclosed rental storage units/cubicles; only
storage is permitted within units.
• Mixed-Use Structure. A building containing residential uses in addition to non-
residential uses permitted in the zoning district. Mixed use structure should not be
confused with a mix of uses each in separate structures in a single development.
• Office, General. The use of land wherein the primary use is the conduct of a
business or profession such as, but not limited to, accounting, tax preparation, lenders and
securities brokers, architecture, computer software or information systems research and
development, engineering, insurance, law, management, organization and association
offices, psychology, theology, real estate, and travel. Radio and television stations are also
included. Retail sales do not comprise more than an accessory use of the primary activity.
This deflnition does not include Medical Office.
• Outdoor Storage. The use of land wherein the primary use is the keeping of goods,
materials, or merchandise outdoors on the same parcel for more than 24 consecutive
hours.
• Park, Public. Publicly owned/operated parks, gardens, open spaces, picnic areas,
playgrounds, and indoor/outdoor recreational facilities; distinct from Public Use.
• Power Station. A facility, system, or similar use whose primary purpose is the
generation, production, storage, transmission, distribution and/or offsetting of electric
power for offsite and/or onsite consumption, fueled by transmission power, natural gas,
wind, solar, battery, and/or another form of renewable or nonrenewable energy. Such
facilities may include, without limitation, electrical switching facilities and stations,
10
substations, interconnection facilities, transmission lines and related towers, gas or oil
transmission lines, pumping stations, metering stations, compressors, battery cells,
unmanned telephone exchange centers, microwave and radiowave transmission and relay
towers, wastewater treatment plants, water towers, and other associated utility
infrastructure, security infrastructure, storage facilities, accessory structures, storage
areas, and ancillary uses that support development of and operations at a Power Station
and/or a Data Center.
• Public Use. Use of land exclusively for public purposes by federal, state, or local
government or authorities (e.g., emergency services, libraries, public offices); excludes
parks and public recreational facilities.
• Recreational Vehicle Storage Facility. Area used for a fee to store recreational
vehicles and boats not currently in use; may be incidental to a marina.
• Recycling Facility. Enclosed facility where recoverable resources (e.g., paper, glass,
metals, oil, tires) are recycled or reprocessed so they may be used again in production;
excludes junkyards/salvage yards.
• Restaurant, General. Establishment dispensing food or beverages for on premises
consumption, such as cafes, delis with seating, tea rooms, and similar.
• Restaurants, Mobile. Readily movable wheeled cart, trailer, or vehicle
designed/equipped to prepare and sell food at temporary locations; includes food trucks,
trailers, and carts.
• Sawmill or Planing Mill, Permanent. Permanently located facility that processes
timber regardless of origin; may include wood processing and wood manufacturing (e.g.,
planing, chipping, pallets).
• Sawmill, Temporary. Portable sawmill or chipping mill processing timber cut only
from the host property or immediately adjacent, commonly under common ownership.
• Telecommunications Facility. Any unstaffed facility for the transmission and/or
reception of radio, television, radar, cellular telephone, personal paging device, specialized
mobile radio (SMR), and similar services. A broadcasting or communication tower usually
consists of an equipment shelter or cabinet, a support tower or other structure used to
achieve the necessary elevation, and the transmission or reception devices or antenna.
• Telecommunications Facility, Small-Cell. Wireless facility where each antenna is
within an enclosure of ≤6 cubic feet (or flts in an imaginary enclosure ≤6 cu ft) and all other
associated equipment totals ≤28 cubic feet, with specifled exclusions from the volume
calculation.
11
• Tradesperson Service. Tradesperson service means an establishment or place of
business primarily engaged in providing a speciflc trade service to individuals. Typical uses
include plumbing, electricians, and landscapers. This deflnition does not include vehicle
repair or construction material sales.
• Transportation Services. Passenger ground transportation services provided by
public, private, or nonproflt entities, including bus, taxi, and limousine services.
• Truck/Freight Terminal. Land used for switching, storing, assembling, distributing,
consolidating, moving, repairing, weighing, or transferring freight by road or rail; rail
appurtenances may be incidental.
• Vehicle Repair Service. Repair and/or maintenance of automobiles, noncommercial
trucks, motorcycles, motor homes, RVs, or boats, including sale/installation/servicing of
parts and equipment; typical uses include tire, wheel/brake, and oil/lube services; minor
repairs/routine maintenance.
• Veterinary Hospital. Establishment rendering medical and surgical treatment of
animals; any boarding of domestic animals must be incidental, indoors, and short term
unless also permitted as a commercial kennel.
• Warehousing and Distribution. Enclosed storage, warehousing, and dispatching of
goods; typical uses include wholesale distributors, e commerce fulflllment centers,
storage warehouses, data centers, and moving/storage flrms; incidental fieet
parking/fueling may be accessory.