SMART_SCALE_PRESENTATIONTHE BASICS OF SMART SCALE
Carson Eckhardt, District Transportation Planner
•SMART SCALE is a funding program with a goal of finding the
most efficient transportation projects with a limited funding
pool.
•SMART SCALE utilizes VTrans as the basis for these projects.
These needs are referred to as VTrans Mid-term Needs.These
needs provide the initial eligibility for a project.
•SMART SCALE is a collaborative effort between the locality,
and VDOT, DRPT (Department of Rail and Public
Transportation) and OIPI (Office of Intermodal Planning and
Investment).
Virginia Department of Transportation
What is SMART SCALE?
•The SMART SCALE process can be summarized as such:
•Eligibility / Funding –Conducted by VDOT, DRPT and OIPI
•Project Application –Conducted by Localities
•Project Screening –Conducted by VDOT, DRPT and OIPI
•Prioritization / Programming –Finalized by CTB Approval
•For localities, your timeline will start March 1st with the Pre-
Application process and last until August 1st with the final
application deadline.
Virginia Department of Transportation
The SMART SCALE Process
Virginia Department of Transportation
SMART SCALE Schedule
•Projects are scored based on six data-driven factors. These
are:
•Safety
•Congestion
•Accessibility
•Land Use (Changed as of Round 6)
•Economic Development
•Environmental
•These 6 categories all have internal measures within them.
Each measure has a different weight within that category.
Virginia Department of Transportation
How are projects scored?
•Projects in different parts of the state are scored differently.
This means that some factors have more weight in final
scoring than others.
•The Lynchburg District only has to worry about Categories C
& Category D.
Virginia Department of Transportation
Factor Weighing
Factor Congestion
Mitigation
Economic
Development
Accessibility Safety Environmental
Quality
Category C 20 percent 25 percent 15 percent 30 percent 10 percent
Category D 10 percent 30 percent 10 percent 40 percent 10 percent
Virginia Department of Transportation
Factor Weightings Across the Commonwealth
•The two main funding streams in the SMART SCALE system
are:
•District Grant Programs (DGP). Only open to localities and projects
compete with other projects in the same district.
•High-Priority Projects Program (HPPP). Projects under this funding
stream compete with other projects across the whole
Commonwealth.
•SMART SCALE also has application caps based on
population:
•Maximum Number of Pre-Applications: 5
•Maximum Number of Applications: 4
Virginia Department of Transportation
How are Projects Funded?
•With the changes to Round 6 of SMART SCALE, there will be
more internal review and validation from VDOT.
•As SMART SCALE is a data-driven process and study data
used for projects must be up to date for departments within
VDOT to check off on the project submission.
Virginia Department of Transportation
Summary of Round 6
•The upcoming schedule for SMART SCALE is the following
(can be found on the SMARTSCALE website at
https://smartscale.org )
•Feb 28th, 2024: Pre-App Round 6 Training (2pm –4pm)
•March 1st, 2024: Pre-Apps Open
•April 1st, 2024: Pre-Apps Close
•July 15th, 2024: Supporting documentation due for all applications
•August 1st, 2024: Round 6 Full Applications due.
Virginia Department of Transportation
Upcoming Schedule
Carson Eckhardt, District Transportation Planner
Carson.Eckhardt@vdot.virginia.gov
434-473-0946
Virginia Department of Transportation
Any Questions?