Loading...
2020-07-02 Smart Scale PITTSYLVANIA COUNTY BOARD OF SUPERVISORS RESOLUTION#2020-07-02 Resolution in Support of County Smart Scale Projects VIRGINIA: At the business meeting of the Pittsylvania County Board of Supervisors ("Board"),held on Tuesday, July 21, 2020,the following Resolution was presented and adopted: WHEREAS, the Virginia Department of Transportation ("VDOT") administers Smart Scale with the goal of investing limited tax dollars in the right Projects that meet the most critical transportation needs in Virginia; and WHEREAS, Projects are funded through a prioritization process that evaluates each Project's merits using key factors, including improvements to safety, congestion reduction, accessibility, land use, economic development, and the environment; and WHEREAS, Pittsylvania County, Virginia ("County") and the West Piedmont Planning District Commission submitted preapplications to be considered for funding; and WHEREAS, the following Projects were initially screened and determined to meet the requirements of Project eligibility and readiness needed to submit a full Smart Scale application: • Kentuck Road Improvements: The Project will improve Kentuck Road between Eagle Springs Road and Kentuck Road to approximately 0.46 miles to the north. Improvements will include reconstructing this segment of road to include 12' lanes and 8' paved and 2' graded shoulders. Intersection improvements are also proposed at the intersection of Kentuck Road and Ringgold Industrial Parkway as well as at Kentuck Road and Eagle Springs Road and Wilkerson Road. • Berry Hill Connector Road Extension: The Project involves reconfiguring Berry Hill Road as an extension of the programmed Berry Hill Connector Road by widening "Segment C" of the road from 2 lanes to a 4 lane Rural Collector Road System (GS-3). The improvements would extend approximately 2.3 miles, from the intersection of the new Connector Road south to Oak Hill Road. A 2018 Study indicates the road is not sufficient to accommodate traffic from the developing adjacent Southern Virginia Mega Site at Berry Hill. • Rte. 29 at Tightsqueeze Road: Reconfigure the intersection at US 29 and Tightsqueeze Road to a Restricted Crossing U-Turn (RCUT). Construct signalized median openings with loons to the north and south of the intersection to accommodate U-turns. Construct a left-in only median north of the intersection. • U.S. Route 29 at Malmaison Road Roundabout: Reconfigure the intersection at U.S. 29 and Malmaison Road to a roundabout. Convert the existing median opening south of the intersection to a left-in only. • U.S.29 at Lawless Creek Road: Reconfigure the intersection at U.S.29 and Lawless Creek Road to a single-lane roundabout; and WHEREAS,these Projects are in the public interest and will benefit both County residents those travelling through the County. NOW, THEREFORE,BE IT RESOLVED, the Board endorses and supports the Smart Scale applications listed herein and respectfully requests support for these projects from VDOT and the Commonwealth Transportation Board("CTB"); and FINALLY, BE IT RESOLVED, that a copy of this adopted Resolution be forwarded to the VDOT Commissioner and the CTB. Given under my hand this 21st day of June, 2020. Robert("Bob") W. Warren Pittsylvania County Board of Supervisors, Chairman • 4. ATT _ : • • A ,__ ^ Or r - '' David M. Smitherman Pittsylvania County Board of Supervisors, Clerk